08 Jun 2026

02:41

  • Bitumen 60/70

    438$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.8%

  • Bitumen 60/70

    438$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.8%

  • Bitumen 60/70

    418$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    -1.9%

  • Bitumen 60/70

    408$

    +

    -

    15$

    FOB Bandar Abbas - Flexitank

    -1.2%

  • Bitumen VG10

    429$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.9%

  • Bitumen VG30

    430$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.9%

  • Bitumen VG40

    432$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.9%

  • Bitumen C170

    433$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.8%

  • Bitumen C320

    432$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.9%

  • Bitumen AH70

    422$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    -1.9%

  • Bitumen PG 76-10

    610$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.3%

  • Bitumen 200/300

    428$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    -1.9%

  • Bitumen Oxidized 115/15

    392$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    -2.0%

  • Bitumen Oxidized 105/15

    392$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    -2.0%

  • Bitumen Oxidized 85/25

    394$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    -2.0%

  • Bitumen Oxidized 95/25

    394$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    -2.0%

  • Bitumen Emulsion CRS-1

    576$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    -1.4%

  • Bitumen Emulsion K1-60

    576$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    -1.4%

  • Bitumen Emulsion CRS-2

    619$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    -1.3%

  • Bitumen Cutback MC70

    630$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    -1.3%

  • Bitumen Cutback MC30

    645$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    -1.2%

  • Bitumen Cutback MC250

    616$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    -1.3%

  • HSFO CST 180

    571$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    -2.6%

  • HSFO CST 380

    567$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    -3.0%

  • HSFO CST 180

    616$

    +

    -

    5$

    FOB Singapore - Bulk

    -2.6%

  • HSFO CST 380

    612$

    +

    -

    5$

    FOB Singapore - Bulk

    -2.9%

  • Crude Oil Dubai

    102.56$

    +

    -

    5$

    FOB UAE - Bulk

    2.5%

  • Crude Oil WTI

    94.93$

    +

    -

    5$

    Texas - Bulk

    2.1%

  • Crude Oil Brent

    97.56$

    +

    -

    5$

    London - Bulk

    2.6%

3D-Printed Copper Plates Could Cut Data Center Cooling Energy Use by 97%

codarx

codarx

Share

to read: 30 second

Ratings:
()
/ 5

Update date: 2026/05/22

The artificial intelligence boom is creating an energy monster that the world is unprepared and unequipped to deal with. Providing enough energy to fuel the AI ambitions of the future as well as to support human demand and development will require advances in energy technologies that are as-yet undiscovered. “There’s no way to get there without a breakthrough,” Sam Altman, co-founder and CEO of ChatGPT firm OpenAI, said at the 2024 World Economic Forum in Davos, Switzerland. More accurately, it will probably require several breakthroughs.…

Rate This Article

How useful was this post?

Click on a star to rate it!

Average rating / 5. Vote count:

No votes so far! Be the first to rate this post.

Comments