13 Apr 2026

08:30

  • Bitumen 60/70

    444$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen 60/70

    444$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen 60/70

    424$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    1.4%

  • Bitumen 60/70

    409$

    +

    -

    15$

    FOB Bandar Abbas - Flexitank

    0%

  • Bitumen VG10

    435$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen VG30

    436$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen VG40

    438$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen C170

    439$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen C320

    438$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen AH70

    428$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    1.4%

  • Bitumen PG 76-10

    616$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.0%

  • Bitumen 200/300

    434$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen Oxidized 115/15

    398$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Oxidized 105/15

    398$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Oxidized 85/25

    400$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Oxidized 95/25

    400$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Emulsion CRS-1

    582$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • Bitumen Emulsion K1-60

    582$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • Bitumen Emulsion CRS-2

    625$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • Bitumen Cutback MC70

    636$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.9%

  • Bitumen Cutback MC30

    651$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.9%

  • Bitumen Cutback MC250

    622$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • HSFO CST 180

    559$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    -2.3%

  • HSFO CST 380

    554$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    -1.6%

  • HSFO CST 180

    633$

    +

    -

    5$

    FOB Singapore - Bulk

    -2.2%

  • HSFO CST 380

    628$

    +

    -

    5$

    FOB Singapore - Bulk

    -1.4%

  • Crude Oil Dubai

    119.76$

    +

    -

    5$

    FOB UAE - Bulk

    4.0%

  • Crude Oil WTI

    104.62$

    +

    -

    5$

    Texas - Bulk

    4.3%

  • Crude Oil Brent

    102.76$

    +

    -

    5$

    London - Bulk

    4.7%

NextDecade Seeks to Expand Further Rio Grande LNG Export Project

codarx

codarx

Share

to read: 30 second

Ratings:
()
/ 5

Update date: 2025/11/24

U.S. LNG developer NextDecade plans to expand further its Rio Grande export project with a sixth train, for which it has just initiated the pre-filing process with the Federal Energy Regulatory Commission (FERC).   NextDecade has already approved and is building five trains at its flagship Rio Grande LNG export facility in Brownsville, Texas. All of these trains are expected to come online by the early 2030s.     The company is now seeking with the FERC further expansion at Rio Grande LNG that includes a sixth liquefaction…

Rate This Article

How useful was this post?

Click on a star to rate it!

Average rating / 5. Vote count:

No votes so far! Be the first to rate this post.

Comments