10 Aug 2026

00:29

  • Bitumen 60/70

    414$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen 60/70

    414$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen 60/70

    394$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    0.0%

  • Bitumen 60/70

    413$

    +

    -

    15$

    FOB Bandar Abbas - Flexitank

    0.0%

  • Bitumen VG10

    405$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen VG30

    406$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen VG40

    408$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen C170

    409$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen C320

    408$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen AH70

    398$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    0.0%

  • Bitumen PG 76-10

    586$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen 200/300

    404$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0.0%

  • Bitumen Oxidized 115/15

    368$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0.0%

  • Bitumen Oxidized 105/15

    368$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0.0%

  • Bitumen Oxidized 85/25

    370$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0.0%

  • Bitumen Oxidized 95/25

    370$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0.0%

  • Bitumen Emulsion CRS-1

    552$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.0%

  • Bitumen Emulsion K1-60

    552$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.0%

  • Bitumen Emulsion CRS-2

    595$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.0%

  • Bitumen Cutback MC70

    606$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.0%

  • Bitumen Cutback MC30

    621$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.0%

  • Bitumen Cutback MC250

    592$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.0%

  • HSFO CST 180

    461$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    0.0%

  • HSFO CST 380

    459$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    0.0%

  • HSFO CST 180

    531$

    +

    -

    5$

    FOB Singapore - Bulk

    0.0%

  • HSFO CST 380

    529$

    +

    -

    5$

    FOB Singapore - Bulk

    0.0%

  • Crude Oil Dubai

    78.37$

    +

    -

    5$

    FOB UAE - Bulk

    1.8%

  • Crude Oil WTI

    77.97$

    +

    -

    5$

    Texas - Bulk

    -0.3%

  • Crude Oil Brent

    84.75$

    +

    -

    5$

    London - Bulk

    1.4%

Saudi Arabia’s Dream of a Futuristic Mega-City Collides With Reality

codarx

codarx

Share

to read: 30 second

Ratings:
()
/ 5

Update date: 2026/03/15

Since Saudi Arabia announced plans to develop its Neom mega-project in 2017, it has been widely criticised by architects, engineers, and energy experts for being unattainable. Nevertheless, the Kingdom marched on, commencing works on several parts of its mega-city, including The Line (a 170-km linear city), Oxagon (floating industrial hub), Trojena (mountain ski resort), and Sindalah (luxury island). However, as projected construction costs have risen again and again, and several challenges have arisen, the government has finally decided to scrap…

Rate This Article

How useful was this post?

Click on a star to rate it!

Average rating / 5. Vote count:

No votes so far! Be the first to rate this post.

Comments