13 Mar 2025

02:49

  • Bitumen 60/70

    333$

    +

    -

    3$

    Iran - Bulk

    3.3%

  • Bitumen 60/70

    405$

    +

    -

    3$

    Iran - New Steel Drum

    2.7%

  • Bitumen 60/70

    405$

    +

    -

    3$

    Iran - New Steel Drum

    2.7%

  • Bitumen 60/70

    380$

    +

    -

    3$

    Iran - Jumbo Bag

    2.9%

  • Bitumen 60/70

    371$

    +

    -

    3$

    Iran - Flexitank

    3.0%

  • Bitumen VG10

    397$

    +

    -

    3$

    Iran - New Steel Drum

    2.8%

  • Bitumen VG30

    397$

    +

    -

    3$

    Iran - New Steel Drum

    2.8%

  • Bitumen VG40

    400$

    +

    -

    3$

    Iran - New Steel Drum

    2.8%

  • Bitumen C170

    401$

    +

    -

    3$

    Iran - New Steel Drum

    2.7%

  • Bitumen C320

    400$

    +

    -

    3$

    Iran - New Steel Drum

    2.8%

  • Bitumen AH70

    396$

    +

    -

    3$

    Iran - Jumbo Bag

    2.8%

  • Bitumen PG 76-10

    411$

    +

    -

    3$

    Iran - New Steel Drum

    2.7%

  • Bitumen 200/300

    400$

    +

    -

    3$

    Iran - New Steel Drum

    2.8%

  • Bitumen Oxidized 115/15

    363$

    +

    -

    2$

    Iran - Carton 25KG

    3.0%

  • Bitumen Oxidized 105/15

    363$

    +

    -

    3$

    Iran - Carton 25KG

    3.0%

  • Bitumen Oxidized 85/25

    363$

    +

    -

    3$

    Iran - Carton 25KG

    3.0%

  • Bitumen Oxidized 95/25

    366$

    +

    -

    3$

    Iran - Carton 25KG

    3.0%

  • Bitumen Emulsion CRS-1

    505$

    +

    -

    5$

    Iran - Reconditioned Drum

    2.2%

  • Bitumen Emulsion K1-60

    539$

    +

    -

    5$

    Iran - Reconditioned Drum

    2.0%

  • Bitumen Emulsion CRS-2

    552$

    +

    -

    5$

    Iran - Reconditioned Drum

    2.0%

  • Bitumen Cutback MC70

    626$

    +

    -

    5$

    Iran - Reconditioned Drum

    1.8%

  • Bitumen Cutback MC30

    636$

    +

    -

    5$

    Iran - Reconditioned Drum

    1.7%

  • Bitumen Cutback MC250

    606$

    +

    -

    5$

    Iran - Reconditioned Drum

    1.8%

  • HSFO CST 180

    439$

    +

    -

    5$

    Iran - Bulk

    -0.5%

  • HSFO CST 380

    436$

    +

    -

    5$

    Iran - Bulk

    0%

  • HSFO CST 180

    460$

    +

    -

    5$

    Singapore - Bulk

    -0.2%

  • HSFO CST 380

    457$

    +

    -

    5$

    Singapore - Bulk

    0%

  • Crude Oil Dubai

    69$

    +

    -

    5$

    United Arab Emirates - Bulk

    1.4%

  • Crude oil WTI

    67$

    +

    -

    5$

    United States - Bulk

    1.5%

  • Crude Oil brent

    72$

    +

    -

    5$

    United Kingdom - Bulk

    0%

Traders Keep Up with Price Hikes

Mahnaz Golmohammadian

Publish Date: 2021/10/26

Share Report
Traders Keep Up with Price Hikes

Commodities Leading the Market
Bitumen and petrochemicals carry on the upward trends for another week. In the Middle East, bulk and new steel drum bitumen spiked nearly 20 US dollars. Market participants are currently trading bulk bitumen around $375 – $385 and the new steel drums for $450 – $460 since the first of the week, October 25.

Prices in Africa, Europe and China increased as well; however, the gain was not as sharp as in the Middle East. Europe and Asia are still fighting back the energy crisis as the gas and oil prices rise up.

Crude and other commodities are running higher every week. The speedy rise of oil is pulling all the petrochemicals forward. Options traders are hoping for prices over $200 while some even doubt about $100. There are not many obstacles on the short-term path of crude to pass over the $100. The new covid outbreak in several northern regions might have a negative sentiment on the market and intervene with the bullish movements of the market for a while, but it does not seem to be a severe change of demand.

The sharp price changes, however, has not stopped traders and constructors. Road and highway constructors are moving according to the schedules without any change of plans. In South Africa, tenders are opening for a series of road construction projects. There are 12 projects of road constructions, including the N2 and N3 routes. The total value of the projects is about $562 Seven tenders are specifically opening for the N3 that connects Johannesburg to Durban. The South African National Roads Agency (SANRAL) intends to invest $2.7 billion in improving roads and highways to reduce traffic congestions and shortening daily commutes.

Comments