13 Apr 2026

10:24

  • Bitumen 60/70

    444$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen 60/70

    444$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen 60/70

    424$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    1.4%

  • Bitumen 60/70

    409$

    +

    -

    15$

    FOB Bandar Abbas - Flexitank

    0%

  • Bitumen VG10

    435$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen VG30

    436$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen VG40

    438$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen C170

    439$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen C320

    438$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen AH70

    428$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    1.4%

  • Bitumen PG 76-10

    616$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.0%

  • Bitumen 200/300

    434$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    1.4%

  • Bitumen Oxidized 115/15

    398$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Oxidized 105/15

    398$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Oxidized 85/25

    400$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Oxidized 95/25

    400$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    1.5%

  • Bitumen Emulsion CRS-1

    582$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • Bitumen Emulsion K1-60

    582$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • Bitumen Emulsion CRS-2

    625$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • Bitumen Cutback MC70

    636$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.9%

  • Bitumen Cutback MC30

    651$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0.9%

  • Bitumen Cutback MC250

    622$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    1.0%

  • HSFO CST 180

    559$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    -2.3%

  • HSFO CST 380

    554$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    -1.6%

  • HSFO CST 180

    633$

    +

    -

    5$

    FOB Singapore - Bulk

    -2.2%

  • HSFO CST 380

    628$

    +

    -

    5$

    FOB Singapore - Bulk

    -1.4%

  • Crude Oil Dubai

    119.76$

    +

    -

    5$

    FOB UAE - Bulk

    4.0%

  • Crude Oil WTI

    104.62$

    +

    -

    5$

    Texas - Bulk

    4.3%

  • Crude Oil Brent

    102.76$

    +

    -

    5$

    London - Bulk

    4.7%

Petrochemical on A Possible Uptrend

Mozhdeh Darbandizadeh

Publish Date: 2022/04/26

Share Report
Petrochemical on A Possible Uptrend

Construction Outlook
Bitumen had several increases during the third week of April. Prices are now up by about + $ 10 in the Middle East. The new steel drum is currently $ 485 – $ 495 and the bulk bitumen is in the range of $ 425 – $ 435 per ton. In Europe, prices are volatile due to the supply shortage. CFR Antwerpen port is fluctuating in the range of $ 547 – $ 557. In Africa, CFR prices increased by about $ 15. CFR Douala is currently fluctuating in the range of $ 925 – $ 935.

Construction projects are still struggling with the Covid economic impacts. In countries such as African territories, construction infrastructures have the capacity to absorb huge amounts of capital. In fact, big economies have been always interested in the lucrative construction industry of Africa. China invested 4,230 million US dollars in the African construction industry in 2020.

The African construction market has plans to reach a CAGR of more than 7.5% from 2022 to 2027. Considering the great potential of various regions in Africa, construction sections have a promising long-term outlook.

Developing construction infrastructures is a vital plan in all the growing population countries. At the moment, most regions are recovering from the impacts of covid on their economies but soon they will focus on enhancing roads and buildings. The bitumen industry can have a huge growth when the projects start.

Considering the long-term uptrend of oil and the expected demand rise, bitumen and construction materials can experience sharp increases by 2025. Traders and market participants should consider the growth in their long term visions to avoid probable losses.

Comments