18 May 2026

02:32

  • Bitumen 60/70

    446$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen 60/70

    446$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen 60/70

    426$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    0%

  • Bitumen 60/70

    413$

    +

    -

    15$

    FOB Bandar Abbas - Flexitank

    0%

  • Bitumen VG10

    437$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen VG30

    438$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen VG40

    440$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen C170

    441$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen C320

    440$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen AH70

    430$

    +

    -

    15$

    FOB Bandar Abbas - Jumbo Bag

    0%

  • Bitumen PG 76-10

    618$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen 200/300

    436$

    +

    -

    15$

    FOB Bandar Abbas - New Steel Drum

    0%

  • Bitumen Oxidized 115/15

    400$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0%

  • Bitumen Oxidized 105/15

    400$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0%

  • Bitumen Oxidized 85/25

    402$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0%

  • Bitumen Oxidized 95/25

    402$

    +

    -

    15$

    FOB Bandar Abbas - Carton 25KG

    0%

  • Bitumen Emulsion CRS-1

    584$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0%

  • Bitumen Emulsion K1-60

    584$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0%

  • Bitumen Emulsion CRS-2

    627$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0%

  • Bitumen Cutback MC70

    638$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0%

  • Bitumen Cutback MC30

    653$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0%

  • Bitumen Cutback MC250

    624$

    +

    -

    15$

    FOB Bandar Abbas - Reconditioned Drum

    0%

  • HSFO CST 180

    673$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    4.5%

  • HSFO CST 380

    653$

    +

    -

    5$

    FOB Bandar Abbas - Bulk

    4.4%

  • HSFO CST 180

    731$

    +

    -

    5$

    FOB Singapore - Bulk

    4.1%

  • HSFO CST 380

    712$

    +

    -

    5$

    FOB Singapore - Bulk

    4.1%

  • Crude Oil Dubai

    102.6$

    +

    -

    5$

    FOB UAE - Bulk

    0.2%

  • Crude Oil WTI

    107.2$

    +

    -

    5$

    Texas - Bulk

    1.7%

  • Crude Oil Brent

    110.73$

    +

    -

    5$

    London - Bulk

    1.3%

Traders Keep Up with Price Hikes

Mozhdeh Darbandizadeh

Publish Date: 2021/10/26

Share Report
Traders Keep Up with Price Hikes

Commodities Leading the Market
Bitumen and petrochemicals carry on the upward trends for another week. In the Middle East, bulk and new steel drum bitumen spiked nearly 20 US dollars. Market participants are currently trading bulk bitumen around $375 – $385 and the new steel drums for $450 – $460 since the first of the week, October 25.

Prices in Africa, Europe and China increased as well; however, the gain was not as sharp as in the Middle East. Europe and Asia are still fighting back the energy crisis as the gas and oil prices rise up.

Crude and other commodities are running higher every week. The speedy rise of oil is pulling all the petrochemicals forward. Options traders are hoping for prices over $200 while some even doubt about $100. There are not many obstacles on the short-term path of crude to pass over the $100. The new covid outbreak in several northern regions might have a negative sentiment on the market and intervene with the bullish movements of the market for a while, but it does not seem to be a severe change of demand.

The sharp price changes, however, has not stopped traders and constructors. Road and highway constructors are moving according to the schedules without any change of plans. In South Africa, tenders are opening for a series of road construction projects. There are 12 projects of road constructions, including the N2 and N3 routes. The total value of the projects is about $562 Seven tenders are specifically opening for the N3 that connects Johannesburg to Durban. The South African National Roads Agency (SANRAL) intends to invest $2.7 billion in improving roads and highways to reduce traffic congestions and shortening daily commutes.

Comments